Electrical sub-contractor for hospital restoration and repair project. The project scope included de-energizing power and undertake LO/TO procedures to the designated work area whilst maintaining hospital operations. Operating in a controlled environment with adherence to Health, Safety and Security codes and practices. Remove and replace electrical outlets, circuit tracing, update panel schedules, replace electrical receptacles, protect emergency generator back-up electrical systems, and deactivate and re-install electrical system for hospital ward/room raceways. Electrical power and lighting work also for the main ER reception area.